Whangarei Girls High School

Complete – April 2024

About

Fast paced repair of major water damage. This was completed over a 4 week period after significant water damage had occurred.

We dried the space, removed all broken components, and repaired everything on a tight deadline. Repairs included, Structural framing, fire doors, kitchens, gib linings, insulation, windows, Acoustic linings, plaster, paint and flooring.

We put in over 2000 hours in a 4 week period to get this turned around.

Before

During

After