Leigh School

Complete – Feb 2024

About

We were tasked with giving Leigh Primary a swift revamp.

Within a 10-day period, we installed wet wall linings, upgraded their lighting, repainted, installed acoustic linings, and upgraded their sickbay. The project was fast-paced, involving multiple parties, and the results were impressive given the tight timeframe.

Leigh School Before

 

Leigh School After